Global Leader in International LNG Industry News

posted in:

Statoil announces Hammerfest LNG shut after power failure

Tuesday, Nov 20, 2012

Production at Statoil's LNG plant at Melkøya, Hammerfest has been shut down after power failure just before 14.30 pm on Monday.

The incident resulted in the emergency response organisation being mobilised, and personnel were according to instructions evacuated from the inner area to the outer plant area. No one was injured during the incident.

The plant was without power for about 20 minutes before it received power from the grid, and work to normalise activity is now being carried out.

Production at Hammerfest LNG will remain shut down until the facility has been inspected Tuesday and checked for any damage or malfunction.

The authorities have been notified and the incident will be investigated.

Facts about Snøhvit and Melkøya

Snøhvit was the first petroleum development in the Barents Sea. Large volumes of natural gas are transported through a 143-kilometre pipeline to shore and cooled at Europe’s first production facility for liquefied natural gas, Hammerfest LNG.

Snøhvit is the first major development on the Norwegian shelf where the entire production facility is placed on the seabed, between 250 and 345 metres below the sea surface. At the LNG plant on Melkøya the wellstream is separated and the natural gas is cooled to minus 163 degrees Celsius before being shipped to the market.

Partners:  Statoil (36.79% – operator), Petoro (30%), Total E&P Norge (18.40%), GDF SUEZ E&P Norge (12%) and RWE Dea Norge (2.81%).

Source: Statoil

To access over 3,000 of the latest oil projects from across the world visit Projects OGP for free trial today

posted in:

Other LNG News

KBR awarded FEED contract for world-scale LNG project in British Columbia 22-05-2013
America's Energy Advantage statement on LNG export decision 21-05-2013
API announces approve remaining U.S. LNG export permits without delay 21-05-2013
Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui sign tolling capacity, joint-venture agreements for Louisiana liquefaction export facility 21-05-2013
Dow supports U.S. department of energy LNG export decision 20-05-2013
SPDC declares force majeure on gas supplies to NLNG 20-05-2013
ATCO awarded A$100 million subcontract on Wheatstone Project 20-05-2013
MHI signs agreement with Mitsui O.S.K. lines to build "Sayaendo" New-generation LNG carrier 17-05-2013
U.S. LNG exports can boost economy but face competition 17-05-2013
Burckhardt Compression announces first order for Laby-GI fuel gas compressor for dual-fuel two-stroke engines on LNG carriers 16-05-2013